Let's just say there is a lot of dust that gets kicked up with remodels.
Once the fireplace mantle was moved- we got someone in to patch the drywall from the wall removal- and texture all the walls from the repairs and in the kitchen where we took the wallpaper out.
They also painted the kitchen.
The very next day was installation day for our tile floors in the kitchen and laundry room.
Our temporary kitchen-
We had a day to enjoy our new kitchen floors- and then everything got piled into the kitchen so they could install our new wood floors in the living/dining/foyer and a hallway of the first floor.
Leveling the floor with leveling cement-
After two days of fans going all day (and night) the cement was dry enough to install the wood.